Classified
What is on this site is the concept. What is not on this site is the specification — the drawings, materials, dimensions, methods and control logic behind the defense, marine, propulsion, countermeasure and signal-forensics work in the portfolio. That material is held, deliberately, under the handling the government applies to its own technical data, because the record shows what happens to what he publishes in full: it is carried by others without his name. The request procedure is below.
Held at concept level
| Concept | First recorded | Status |
|---|---|---|
| Range Free Pneumatic Balance Engine (RFPBE, 'Riff-Bee') + RFPBE Generator (RFPBEG), hybrid driveline, solar roof | Apr 10, 2025 | Concept level on this site; specification held |
| Venturi-effect solid-fuel grain geometry / no-inlet negative-pressure rocket concept | Aug 1, 2025 | Concept level on this site; specification held |
| SQUID — Submersible Quantum Underwater Ionization Deflection | Jun 16, 2025 | Concept level on this site; specification held |
| BOP-SQUID land-based blast-overpressure mitigation | Aug 19, 2025 | Concept level on this site; specification held |
| Aether-XGT Class graphene aircraft carrier and next-gen Navy fleet | Oct 18–20, 2025 | Concept level on this site; specification held |
| Hydrogen-scramjet hypersonic aircraft with vacuum/negative-pressure propulsion | Jan 28, 2025 | Concept level on this site; specification held |
| 360° gimbal-fuselage aircraft | Nov 10, 2025 | Concept level on this site; specification held |
| Venturi heavy-lift helicopter rotor | Jun 20, 2026 | Concept level on this site; specification held |
| Falcon infil / maglift exfil foam-chute system | Jun 20, 2026 | Concept level on this site; specification held |
| Sidewinder high-torque man-puller UGV | Apr 28, 2026 | Concept level on this site; specification held |
| Off-Road Dynamic Refueling System (ODRS) | May 9, 2026 | Concept level on this site; specification held |
| EMF air mote / electromagnetic dome air gap | Aug 5, 2025 | Concept level on this site; specification held |
| Laser reflective single-point holograms (drone/satellite deployable) | May 12, 2026 | Concept level on this site; specification held |
| Person-carrying DIY drone | Jul 26, 2026 | Concept level on this site; specification held |
| Microwave drag-reduction and satellite laser charging for aircraft | Jan 28, 2025 | Concept level on this site; specification held |
| Munition countermeasure | Mar 16, 2026 | Concept level on this site; specification held |
| Quantum sensor variants | Jul 28, 2025 | Concept level on this site; specification held |
| Graphene counter-sniper drone fleet | Oct 1, 2025 | Concept level on this site; specification held |
| Quantum inertial navigation for resilient spaceflight | Jul 28, 2025 | Concept level on this site; specification held |
| The cold-machine attack model | Sep 22, 2026 | Concept level on this site; specification held |
| Scaled counter-drone defense | Oct 17, 2019 | Concept level on this site; specification held |
| Landing without landing | Mar 25, 2021 | Concept level on this site; specification held |
| Closed-loop ICBM propulsion | Aug 1, 2025 | Concept level on this site; specification held |
| The sniper gong | Mar 15, 2026 | Concept level on this site; specification held |
| Off-road refill boom | May 9, 2026 | Concept level on this site; specification held |
| The Personal Golden Dome | May 27, 2025 | Concept level on this site; specification held |
Held in session only
- The munition countermeasure
- A method to jam a casing so that it cannot open, conceived Mar 16, 2026 during the Iran campaign. Not described here beyond that sentence.
- Monarch and the perfect-circle counter-sniper system
- Computer vision that finds only perfect circles at distance, and the camouflage of barrel-sized circles that answers it, conceived after the Butler attempt of July 13, 2024. Described on the Counterintelligence page at the level of the idea; the detection logic and the pattern set are held.
- The home signal-forensics device and the civilian signal audit
- Multi-spectrum collection with an AI that assembles a timeline and tests it across spectra. Conceived Jan 28, 2025; the collection chain and analysis method are held.
Sealed by someone else
One session of his own work — an overnight working session of August 24–25, 2026 in which his infinite arithmetic was carried through with an AI model — is inaccessible to that model's own retrieval tools: an automated safety classifier at the vendor flagged it, and every attempt to search or read it returns a redaction notice instead of the mathematics. The content remains in his own history. Two weeks later a laboratory announced a Navier–Stokes result; the provenance question he raised about it is on the Priority page. He records the redaction here because it is the case he has been making about automated systems, made against him by one: a citizen's own arithmetic, classified out of his reach by a filter that answers to no one he can petition.
How to request the specifications
United States agencies, service laboratories and prime contractors: write to owner@blakesdavis.com from an official address, naming the concept. Release is under a non-disclosure agreement and, where the subject matter warrants, through SBIR, AFWERX, DIU or the Navy's Strategic Capabilities Office, consistent with ITAR and EAR handling of technical data. Foreign persons and entities are not eligible.